General Description of the Aid available

Application and Documentation

Deadline for Applications

From April 5 to May 4, 2011.

Necessary Documentation

Other files can also be submitted along with the application form. The maximum size of each file is 3 MB and these must be PDF (Portable Document Format).

Java Virtual Machine (version 1.5 or later) is necessary to execute the programme, as indicated in the programme’s instructions for use.

All the documentation must be presented to the electronic record of the Ministry of Industry using an electronic signature. The person submitting the application on behalf of the requesting body must sign this using their user digital certificate. This certificate must have been issued by a certification service-provider approved by the Ministry of Industry, Tourism, and Trade.

  1. Aid application form and questionnaireo
  2. Technical and financial report on the plan of action
  3. Statement of compliance regarding aid requested or received from Public Administrations
  4. Statement regarding Applicant’s Links to Third Parties
  5. Powers of attorney of the party signing the application
  6. Deed establishing the network

Aid application form and questionnaireo

The application form and questionnaire can be filled out on-line using the computer application that can be downloaded at the following link.

Technical and financial report on the plan of action

A contents guide [es] will be provided and should be taken into account and followed by the body requesting the aid when drawing up their own Report, which, once completed, should be sent as an attached file along with the rest of the required documentation.

This Report must include all aspects deemed necessary to assess the plan of action in accordance with the aims and evaluation criteria established in the call for applications.

The index provided is a standardized index and, as such, cannot envisage or fully respond to the specific characteristics of each different plan of action. Therefore, where strictly necessary, the body requesting the aid must provide all the data and information required in order to fully appreciate the true scope and dimension of the plan.

  Guide for Drawing Up the Technical and Financial Report [es]

Statement of compliance regarding aid requested or received from Public Administrations

The declaration regarding other Aid must also be filled out and submitted as an attached file. In the event the aid referred to was not requested or has not been granted, this must be reflected in the corresponding sections by writing “0 Euro” or in the column that refers to the amount.

 Declaration Form regarding Other Aid [es]

Statement regarding Applicant’s Links to Third Parties

In the event the benefiting entity has links with the bodies hired to draft the strategic plan referred to in the technical report proof of these must be provided.

Powers of attorney of the party signing the application

It is necessary to accredit the powers of attorney of the party signing. The presentation of this document will not be necessary when it is already in the possession of the Directorate-General for Small and Medium-Sized Enterprises, in which case an indication must be given, on the application questionnaire, of the file number that was notified at the time. No more than five years must have elapsed since the conclusion of the corresponding procedure.

Deed establishing the network

The provision of these documents is intended to notify the existence of the new vis-à-vis third parties.

Map showing the location of the Entrepreneurs Support Centres
SubSede electrónica de la DGPYME
Cevipyme
Ayudatec
Enterprise Creation Advisory and Initiation Points
SME Securitization Funds-FTPYME
The Ministry of Industry, Tourism, and Trade’s Site

Dirección General de Industria y de la Pequeña y Mediana Empresa
Ministerio de Industria, Energía y Turismo
Paseo de la Castellana, 160 plantas 11-12. - 28071 Madrid - España

Centro de Asesoramiento a Emprendedores

Síguenos en: twitter facebook linkedin

Logo WAI